カンバン

How the kanban methodology applies to software development

The kanban methodology

Kanban is a popular framework used by software teams practicing agile software development. It is enormously prominent among today's agile software teams, but the kanban methodology of work dates back more than 50 years.

In the late 1940s Toyota began optimizing its engineering processes based on the same model that supermarkets were using to stock their shelves. Supermarkets stock just enough product to meet consumer demand, a practice that optimizes the flow between the supermarket and the consumer. Because inventory levels match consumption patterns, the supermarket gains significant efficiency in inventory management by decreasing the amount of excess stock it must hold at any given team. Meanwhile, the supermarket can still ensure that the given product a consumer needs is always in stock.

When Toyota applied this same system to its factory floors, the goal was to better align their massive inventory levels with the actual consumption of materials. To communicate capacity levels in real-time on the factory floor (and to suppliers), workers would pass a card, or "kanban", between teams. When a bin of materials being used on the production line was emptied, a kanban was passed to the warehouse describing what material was needed, the exact amount of this material, and so on. The warehouse would have a new bin of this material waiting, which they would then send to the factory floor, and in turn send their own kanban to the supplier. The supplier would also have a bin of this particular material waiting, which it would ship to the warehouse. While the signaling technology of this process has evolved since the 1940s, this same "just in time" (or JIT) manufacturing process is still at the heart of it.

>> Try this tutorial to create a kanban project with JIRA 

Kanban for software teams

Agile software development teams today are able to leverage these same JIT principles by matching the amount of work in progress (WIP) to the team's capacity. This gives teams more flexible planning options, faster output, clearer focus, and transparency throughout the development cycle.

kanban board for agile development

While the core principles of the framework are timeless and applicable to almost any industry, software development teams have found particular success with the agile practice. In part, this is because software teams can begin practicing with little to no overhead once they understand the basic principles. Unlike implementing kanban on a factory floor, which would involve changes to physical processes and the addition of substantial materials, the only physical things a software teams need are a board and cards, and even those can be virtual.

カンバンボード

The work of all kanban teams revolves around a kanban board, a tool used to visualize work and optimize the flow of the work among the team. While physical boards are popular among some teams, virtual boards are a crucial feature in any agile software development tool for their traceability, easier collaboration, and accessibility from multiple locations.

Regardless of whether a team's board is physical or digital, their function is to ensure the team's work is visualized, their workflow is standardized, and all blockers and dependencies are immediately identified and resolved. A basic kanban board has a three-step workflow: To Do, In Progress, and Done. However, depending on a team's size, structure, and objectives, the workflow can be mapped to meet the unique process of any particular team.

The kanban methodology relies upon full transparency of work and real-time communication of capacity, therefore the kanban board should be seen as the single source of truth for the team's work.

JIRA Software kanban board

Kanban cards

In Japanese, kanban literally translates to "visual signal." For kanban teams, every work item is represented as a separate card on the board.

The main purpose of representing work as a card on the kanban board is to allow team members to track the progress of work through its workflow in a highly visual manner. Kanban cards feature critical information about that particular work item, giving the entire team full visibility into who is responsible for that item of work, a brief description of the job being done, how long that piece of work is estimated to take, and so on. Cards on virtual kanban boards will often also feature screenshots and other technical details that is valuable to the assignee. Allowing team members to see the state of every work item at any given point in time, as well as all of the associated details, ensures increased focus, full traceability, and fast identification of blockers and dependencies.

The benefits of kanban

Kanban is one of the most popular software development methodologies adopted by agile teams today. Kanban offers several additional advantages to task planning and throughput for teams of all sizes.

Planning flexibility

A kanban team is only focused on the work that's actively in progress. Once the team completes a work item, they pluck the next work item off the top of the backlog. The product owner is free to reprioritize work in the backlog without disrupting the team, because any changes outside the current work items don't impact the team. As long as the product owner keeps the most important work items on top of the backlog, the development team is assured they are delivering maximum value back to the business. So there's no need for the fixed-length iterations you find in scrum.

ProTip: Savvy product owners always engage the development team when considering changes to the backlog. For example, if user stories 1-6 are in the backlog, user story 6's estimate may be based on the completion of user stories 1-5. It's always a good practice to confirm changes with the engineering team to ensure there are no surprises. 

Shortened cycle times

Cycle time is a key metric for kanban teams. Cycle time is the amount of time it takes for a unit of work to travel through the team’s workflow–from the moment work starts to the moment it ships. By optimizing cycle time, the team can confidently forecast the delivery of future work.

Overlapping skill sets lead to smaller cycle times. When only one person holds a skill set, that person becomes a bottleneck in the workflow. So teams employ basic best practices like code review and mentoring help to spread knowledge. Shared skills mean that team members can take on heterogeneous work, which further optimizes cycle time. It also means that if there is a backup of work, the entire team can swarm on it to get the process flowing smoothly again. For instance, testing isn't only done by QA engineers. Developers pitch in, too.

カンバン フレームワークでは、仕事がプロセスの中でスムーズに流れるようにするのはチーム全体の責任です。

Fewer bottlenecks

マルチタスクは効率を損ないます。どんな時でも作業中の項目が多ければ多いほど、コンテキストの切り替えが増え、作業の完了が妨げられます。カンバンの重要な原則が進行中の作業 (WIP) 量を制限することとなっているのはそのためです。進行中の作業を制限することにより、集中度や人員、スキルの不足が原因でチームのプロセスに生じるボトルネックと滞りが明確になります。

For example, a typical software team might have four workflow states: To Do, In Progress, Code Review, and Done. They could choose to set a WIP limit of 2 for the code review state. That might seem like a low limit, but there's good reason for it: developers often prefer to write new code, rather than spend time reviewing someone else's work. A low limit encourages the team to pay special attention to issues in the review state, and to review others work before raising their own code reviews. This ultimately reduces the overall cycle time.

Visual metrics

One of the core values is a strong focus on continually improving team efficiency and effectiveness with every iteration of work. Charts provide a visual mechanism for teams to ensure they're continuing to improve. When the team can see data, it's easier to spot bottlenecks in the process (and remove them). Two common reports kanban teams use are control charts and cumulative flow diagrams.

管理図は各課題のサイクルタイムだけでなく、チームの移動平均を表示します。

プロからのヒント: チームの目標は、課題がプロセス全体を移動するのにかかる時間の量を減らすことです。管理図で平均サイクルタイムが下がっていれば、それが成功の指標となります。 

Control chart for kanban agile development

A cumulative flow diagram shows the number of issues in each state. The team can easily spot blockages by seeing the number of issues increase in any given state. Issues in intermediate states such as "In Progress" or "In Review" are not yet shipped to customers, and a blockage in these states can increase the likelihood of massive integration conflicts when the work does get merged upstream. 

Cumulative flow diagram for kanban agile development

継続的デリバリー

We know that continuous integration–the practice of automatically building and testing code incrementally throughout the day–is essential for maintaining quality. Now it's time to meet continuous delivery (CD). CD is the practice of releasing work to customers frequently–even daily or hourly. Kanban and CD beautifully complement each other because both techniques focus on the just-in-time (and one-at-a-time) delivery of value.

チームがイノベーションを市場に届けるスピードが速いほど、その製品の市場における競争力が高まります。そして、カンバンチームはまさにそこに焦点を当てています。すなわち、顧客に届ける作業の流れの最適化です。

スクラムとカンバン

カンバンとスクラムはいくつか同じ概念を共有していますが、そのアプローチは非常に異なっています。この 2 つをたがいに混同してはいけません。 

  スクラム カンバン
期間 一定の固定長のスプリント (すなわち、2 週間) 継続的なフロー
リリース方法 プロダクトオーナーの承認があれば、各スプリントの最後 継続的デリバリーまたはチームの判断
役割 プロダクトオーナー、スクラムマスター、開発チーム 既存の役割なし。チームによりアジャイルコーチの支援を得る。
主要測定指標 ベロシティ サイクルタイム
変更に関する考え方 チームはスプリント中にスプリント予測を変更しないように努力するべきである。変更すれば、見積に関する知見が損なわれる。 いつ変更してもかまわない

カンバンとスクラムの理念を "スクラムバン" に融合しているチームもあります。その場合は、スクラムから固定長スプリントと役割を、カンバンから進行中の作業制限への集中とサイクルタイムを取り込んでいます。しかし、アジャイルを開始したばかりのチームは、どちらか 1 つの方法を選択して、しばらくの間それを実行することを強くお勧めします。あれこれと考えを巡らすのは後でいつでもできます。 